• JSZFW-12W3 outdoor combined voltage transformer
JSZFW-12W3 outdoor combined voltage transformer
discuss personally
Model
JSZFW-12W3-11/√3kV
Basic info
Brand Wone Store
Model NO. JSZFW-12W3 outdoor combined voltage transformer
Rated frequency 50/60Hz
Primary voltage 11/√3kV
Secondary voltage 110/√3V
Series JSZFW
Product Detail

Product Overview

This three phase, six compositions combined CT&VT, consists of three semi-insulation VTs of Y-Y wiring and three CTs series connected with phase A,B,C. Secondary leads in junction box is easy for wiring and testing. Use epoxy resin insulation stunt structure for outdoor installation. Applicable for highest voltage for equipments no more than 24kV for metering/measuring measurement in power system.

Key Features

  • Fully Sealed Structure & Weather-resistant Materials:With a fully sealed design and weather-resistant materials, it achieves IP65 protection rating, resisting salt fog, dust, UV radiation, and other harsh environmental factors to ensure long-term outdoor operational stability.

  •  Integrated Combined Design:Integrates voltage transformer with protection components (e.g., fuses) as a single unit, reducing equipment footprint, simplifying substation layout, and lowering installation & maintenance costs.

  • Wide Temperature Adaptability:Operates stably within -40℃ to +70℃, using low-temperature tough epoxy resin and high-temperature resistant insulation materials to prevent insulation aging caused by temperature fluctuations in extreme environments.

  • High Insulation Reliability:The insulation system passes 12kV/42kV/75kV withstand voltage tests with partial discharge ≤5pC. Built-in overvoltage protection devices effectively prevent damage from switching overvoltage and lightning impulse.

  • Strong Anti-fouling Capability:With external insulation creepage distance ≥31mm/kV and anti-fouling silicone coating, it suits Class Ⅲ and above pollution areas, reducing the risk of flashover accidents and maintenance frequency.

Technical parameter: 

  •  Installation site:Outdoor

  •  Rated Frequency :50/60Hz

  • Burden power factor :CosΦ=0.8(lagging)

  • Technical standard accords with : IEC60044-1 orIEC61869-1&3

Specification:

Remarks: Upon request we are glad to offer transformers according to other standards or with non-standard technical specs.

 

Know your supplier
Wone Store
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment/Instrument Transformer/Equipment Parts
Business Type
Sales
Highest Annual Export (USD)
$300000000
Professional Experience
1 years
Workplace
1000m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!