• Line Sectionalizing Load Break Switch Controller
  • Line Sectionalizing Load Break Switch Controller
Line Sectionalizing Load Break Switch Controller
discuss personally
Model
RWK-381HBV
Basic info
Brand RW Energy
Model NO. Line Sectionalizing Load Break Switch Controller
Rated voltage 230V ±20%
Rated frequency 50/60Hz
Electric energy consumption ≤5W
Series RWK-38
Product Detail

Description

RWK-381 line sectionalizing load break switch controller is a kind of switch which must cooperate with superior switch. It can’t cut off the fault current, it only trip when the line is low-voltage or no-current.

RWK-381 line sectionalizing load break switch controller adopts IT operation mode. When a fault happed, the controller will record the fault times. If the times come to the setting value, the controller will trip after the line is low-voltage or no-current.

The controlling box is made of stainless steel, the surface is dealt with painting, anticorrosion, can be used in outdoor environments.

It has charging circuit: It could take AC220V charging power supply from outside. If there is no power supply outside, it also could achieve opening/closing operation and all controller functions with battery. Besides that, it is set with anti-over discharge circuit for protecting the battery when there is no electricity of the power supply outside for a long time.

Main function introduction

1. Protection relay functions:

1) Section function,

2) 50 Instantaneous/Definite-Time Overcurrent (P.OC),

3) 51 Phase Time-Overcurrent (P.OC2/P.OC3),

4) 49 Overload

5) 50N Residual Ground Instantaneous/Definite-Time Overcurrent(G.OC),

6) 51N Residual Ground Instantaneous/Definite-Time Overcurrent (G.OC2 /G. OC3) ,

7) 50SEF Sensitive Earth Fault (SEF),

8) 51C Cold Load,

9) TRSOTF Switch-Onto-Fault (SOTF)

10) 27 Under Voltage (L.Under volt) ,

11) 59 Over Voltage (L.Over volt),

2. Supervision functions:

1) 74T/CCS Trip & Close Circuit Supervision,

2) 60VTS VT Supervision  .

3. Control functions: 

1) 60VTS Lockout , 

2) circuit-breaker control.

4. Monitoring Functions: 

1) Primary/Secondary Phases and Earth Currents,

2) Direction,

3) Primary/Secondary Line and Phase Voltages,

4) Apparent Power and Power Factor, 

5) Real and Reactive Power, 

6) Positive Phase Sequence Voltage,

7) Negative Phase Sequence Voltage & Current,

8) Zero Phase Sequence Voltage,

9) Earth Current With 3RD Harmonics,

10) Frequency,

11) Binary Input/Output status,

12) Trip circuit healthy/failure,

13) Time and date,

14) Event records

15) Counters,

16) Wear.

5. Communication functions:

a. Communication interface: RS485X1,RJ45X1

b. Communication protocol: IEC60870-5-101; IEC60870-5-104; DNP3.0;  Modbus-RTU

c. PC software: RWK381HB-V2.1.3,The address of the information body can be edited and queried by PC software,

d. SCADA system: SCADA systems that support the four protocols shown in "b.”.

6. Data Storage functions:

1) Event Records,

2) Fault Records,

3) Measurands.

7. remote signaling remote measuring, remote controlling function can be customized address.

Technology parameters

paramete.png

Device structure

RWK-38-尺寸图.png

控制器的应用方案.png

About customization

The following optional functions are available: cabinet heating defrosting device, battery upgrade to lithium battery or other storage equipment, GPRS communication module,1~2 signal indicators,1~4 protection pressure plates, the second voltage transformer, custom aviation socket signal definition.

For detailed customization, please contact the salesman.

 

Q: What is line sectionalizing load break switch?

A:line sectionalizing load break switch is an important device used in power lines. Its main function is to segment the line according to certain rules. The advantage of this is that when a certain segment of the line fails, the segment switch can isolate the faulty segment from the normally functioning line.

Q: How does it determine the segments?

A: The segmentation is usually determined according to the load distribution, geographical layout and power supply reliability requirements of the line. For example, in the area where the load is more concentrated, a separate segment may be divided; Or by geographical area, such as a block or an industrial area.

Q: What is the significance of line sectionalizing load break switch for power system?

A: It can improve the reliability and flexibility of the power system. When a fault occurs, it can quickly isolate the fault, reduce the scope of power outage, so that power maintenance personnel can be more targeted to troubleshoot the fault, and other unaffected segments can continue to supply power normally, ensuring that


Know your supplier
RW Energy
Zhejiang Rockwell Energy Technology Co., Ltd. is an international enterprise specializing in the research, development and manufacturing of recloser controllers, power quality management, power monitoring systems and other high-end power equipment. In today's critical period of global energy transition and power system upgrading, the company has gathered a group of top talents in the fields of power engineering, automation control, software development, etc., who carry the enthusiasm and persistence for the power business, and are committed to overcoming the complex problems in the power system, and promoting the intelligent development of the power industry with innovative technology. Mission: To make global electricity smarter, more reliable and more efficient with innovative technology. Vision: To be the leader in global power intelligence.
Main Categories
High Voltage Electrical Apparatus/New energy/Tester
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$100000000
Professional Experience
12 years
Workplace
30000m²
占位
占位
Documents
Restricted.
line sectionalizing load break switch controller
Manual English
Consulting
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!