• Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
discuss personally
Model
ZHN10-24 /15000-100
Basic info
Brand ROCKWILL
Model NO. Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
Rated voltage 24kV
Rated normal current 15000
Series Circuit Breaker
Product Detail

Description:

This product is an essential switch equipment for achieving rapid shutdown of large hydroelectric generators. In 2019, it was appraised by the National Energy Administration and its comprehensive technical performance is at the leading domestic and international level. Currently, it has supplied 28 products to the Wudongde and Baihetan hydropower stations.

Product Performance:

  • High braking performance parameters: it has the capacity of braking current 30,000A and braking time 50 minutes.

  • High mechanical reliability: the brake switch and earthing switch can meet the mechanical life requirements of operation for 10,000 times.

  • Strong making capacity: the brake switch successfully passed the load current breaking and making test, and the current is 28,000A.

  • Reliable safety protection measures: pressure release device is installed at the top of the brake switch. When the gas pressure in the arc extinguishing chamber exceeds 1.2 MPa due to an accident, the gas will be released to ensure the safety of the personnel and surrounding equipment, The product design can ensure the stable operation of the power plant.

Product Structure:
微信图片_20240615104853_修复后.png

  • Product consists of three single poles, and each pole has an individual enclosed metal enclosure mounted on the same chassis.

  • Brake switch is equipped with hydraulic spring operating mechanism; earthing switch is equipped with a motor operating mechanism; the driving modes are all three-phase mechanical linkage.

  • The main circuit adopts natural cooling.

  • Each operating mechanism is installed on the side of the product close to the control cabinet.

  • SF6 is used as insulation and arc-extinguishing medium for brake switch, The arc-striking contact adopts ablation-resistant copper-tungsten material, which effectively improves the reliability and electrical life of the brake switch.

  • The earthing switch takes air as insulation medium, the fixed contact is installed on the support of the main circuit, the moving side is installed on the bottom plate of the box body, and the moving contact is connected with the single phase enclosure and forms the earthing circuit through the closed bus bar connected with the moving contact.

  • The overall structure of brake switch is compact and convenient for installation and maintenance on site.

Typical applications:
微信图片_20240615104935_修复后.png
微信图片_20240615104912_修复后.png
 Main technical parameters:

image.png

What is the standard for the opening time and opening time of the generator circuit breaker?

The opening and closing times for generator circuit breakers do not have a single fixed standard. The specific standards vary depending on the type of circuit breaker, voltage level, application scenario, and relevant standards and regulations. Below is a detailed introduction to the relevant standards:

Closing Time (Making Time):

  • Standard Range: Generally, the closing time for generator circuit breakers is typically between a few tens of milliseconds to over one hundred milliseconds. For example, common medium-voltage generator circuit breakers may have a closing time in the range of 30ms to 80ms, while high-voltage, high-capacity generator circuit breakers may have slightly longer closing times, but generally within 100ms.

  • Relevant Standards: According to relevant standards, the three-phase asynchronism closing time for generator circuit breakers should not exceed 5ms.

Opening Time (Breaking Time):

  • Standard Range: The opening time is the sum of the closing time and the arc burning time. The value can vary based on multiple factors. Generally, for medium-voltage generator circuit breakers, the opening time may be around 50ms to 150ms, while for high-voltage, high-capacity generator circuit breakers, the opening time may be around 100ms to 250ms.

  • Relevant Standards: For different voltage levels and types of generator circuit breakers, the transient recovery voltage during the interruption of short-circuit currents, load currents, and out-of-step currents should meet the corresponding standard requirements. The first-pole factor and magnitude factor can be taken as 1.5.


Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!