Free Expert Guides on Power Systems, Circuit Design & Electrical Troubleshooting

Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Constant testing of high-voltage cable lines
1. Definition of High-Voltage Cable Line Constant TestingHigh-voltage cable line constant testing refers to the systematic measurement, using specialized instruments, of electrical parameters such as resistance, inductance, capacitance, and conductance before a cable line is commissioned or after major maintenance. The aim is to obtain fundamental data characterizing the electromagnetic properties of the cable, serving as a critical testing phase that provides accurate parameter support for powe
09/03/2025
Consult
Tip
Consult
Tip
Withstand voltage test of high-voltage cables
Withstand voltage test is an insulation test, but it is a destructive test that can reveal insulation defects difficult to detect in non-destructive testing.The test cycle for high-voltage cables is three years, and it must be conducted after non-destructive tests. In other words, the withstand voltage test is performed only after all non-destructive tests have been passed.Most high-voltage cables used today are cross-linked polyethylene (XLPE) cables, which can have large cross-sections and cov
09/03/2025
Consult
Tip
Consult
Tip
Analysis of Issues and Causes in Smart Meter Testing
1. Issues and Cause Analysis in Smart Electricity Meter TestingDuring the verification of smart electricity meters, inspections must be conducted on the meter’s appearance, as well as the clarity and integrity of nameplate markings. Additionally, careful checks are required for physical damage and whether the display can show digits completely. A power-on inspection is also necessary. If error codes appear on the display after power-up, faults should be identified and addressed according to the
09/01/2025
Consult
Tip
Consult
Tip
What tests are required for a qualified smart electricity meter?
In today's world, not wearing a watch is no longer unusual, but not having an electricity meter is a serious issue. As a measuring instrument vital to people's daily lives, the electricity meter is an essential tool for power consumption measurement and billing in every household. According to current national strategic requirements for smart grid development, smart electricity meters have been widely applied and promoted, bringing entirely new and extensive market opportunities to the metering
09/01/2025
Consult
Tip
Consult
Tip
Indoor Load Switch Testing | -Ensure Operational Safety
The testing of indoor load switches should cover their entire lifecycle, focusing on four core aspects: "ensuring reliable insulation, normal mechanical operation, safe switching capability, and operational compatibility." The main testing categories include:1. Insulation Performance Testing: Use a megohmmeter to measure insulation resistance between phases, from phase to ground, and between moving and fixed contacts (≥0.5 MΩ for low voltage, ≥1000 MΩ for high v
08/28/2025
Consult
Tip
Consult
Tip
How to Qualify Low-Voltage Pole-Mounted Circuit Breakers: Personal Testing Checklist
Alright, folks, Oliver Watts here. Been poking, prodding, and testing these pole-mounted breakers for about eight years now, mostly out in the field but also in the lab. Seen a fair share of good ones, bad ones, and... well, let's just say "interesting" ones. So, when we're talking about signing off on a qualified low-voltage pole-mounted circuit breaker – you know, one that's actually gonna do its job when the sh*t hits the fan out there on the line – it ain't just a quick v
08/21/2025
Consult
Tip
Consult
Tip
Inverter Optimization for High-Precision Test Benches
In modern industrial applications, inverters play a crucial role as key components of electrical drive systems. They enable precise speed control and effectively reduce energy consumption, thereby enhancing the overall efficiency and reliability of the system. This article focuses on the performance evaluation and optimization of inverters in test bench design.As experimental platforms that simulate real-world operating conditions, test benches impose higher performance demands on inverters. The
08/18/2025
Consult
Tip
Consult
Tip
Essential Type, Routine, and Site Acceptance Tests for Modern Eco-Friendly RMUs
1. Type Test System and StandardsType testing verifies the design rationality and safety of eco-friendly insulated ring main units (RMUs), based on IEC 62271-200 and GB/T 3906, and includes: Insulation Performance: For 12kV RMUs, power frequency withstand voltage is 42kV (1 min) for main circuits and 48kV for breakers. Lightning impulse withstand is 75kV (12kV system) or 125kV (24kV system), with 15 standard impulses (1.2/50μs) per polarity. Partial discharge must be ≤10pC at 1.2&a
08/13/2025
Consult
Tip
Consult
Tip
Medium-Voltage Solid-Insulated RMUs: Epoxy Resin Insulation and Structural Design Explained
1 Insulation Materials and DesignBased on cost statistics for medium-voltage solid-insulated ring main units (RMUs), the insulation structure accounts for over 40% of the total cost. Therefore, selecting appropriate insulation materials, designing rational insulation structures, and determining the correct insulation method are crucial to the value of medium-voltage RMUs. Since the first synthesis of epoxy resin in 1930, various additives have been continuously explored to improve its properties
08/12/2025
Consult
Tip
Consult
Tip
Live Partial Discharge Testing for RMUs: Methods, Issues, and Solutions
1 Live Testing AnalysisDetection of Issues through Live TestingIn October of a certain year, during live partial discharge (PD) testing on 10kV ring main units (RMUs) under our jurisdiction, the maintenance and testing team observed significantly elevated signal amplitudes in several units (Transient Earth Voltage (TEV) readings around 18 dB, and ultrasonic readings around 20 dB). Most of these units were from the same manufacturer. Consequently, a unified test was conducted on 15 RMUs from this
08/09/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.