• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Free Expert Guides on Power Systems, Circuit Design & Electrical Troubleshooting

Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Analysis of the Necessity of Verifying Voltage Switching During Switching Operations in Double-Busbar Configurations
1.IntroductionIn a double-busbar system, line energizing/de-energizing and bus transfer are fundamental switching operations. Under the double-busbar configuration, line protection voltage is derived from busbar potential transformers (PTs). The PTs are connected to the busbar via primary disconnect switches, with their secondary windings routed to the PT secondary terminal box. Each PT has three secondary windings: one for protection and measurement, one for metering, and one open-delta winding
11/20/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.