Free Expert Guides on Power Systems, Circuit Design & Electrical Troubleshooting

Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Metal material used in GIS
SteelThe enclosure has two fundamental functions: maintaining internal gas pressure and ensuring gas - tightness to prevent the release of SF6 into the atmosphere. Sheet steel materials are well - suited for fulfilling these functions. In contrast, cast steel has porosity issues and cannot guarantee the high - level gas - tightness required for Gas - Insulated Switchgear (GIS).Steel is relatively easy to weld and shape. Steel enclosures are typically fabricated by mechanically forming steel shee
04/10/2025
Consult
Tip
Consult
Tip
Distribution transformer guide: Installation, commissioning, operation and maintenance hints
Transformer ServiceThis guide comprehensively covers various aspects of distribution transformers. It delves into the construction elements, including the core, windings, cooling system, tank and cover, conservator, pressure relief device, Buchholz relay, silica gel breather, and winding temperature indicator. Additionally, it addresses topics such as transport, packing, and despatch processes, installation procedures, fittings and accessories, commissioning steps, as well as operation and maint
04/10/2025
Consult
Tip
Consult
Tip
Good operating practices for switchgear circuit breakers and contactors
Good operating practices for switchgear circuit breakers and contactorsOperation of LV/MVSwitchgearThe aim of this guideline is to offer recommended practices for the operation and inspection of medium - voltage (2 - 13.8 kV) and low - voltage (200 - 480 V) draw - out switchgear circuit breakers and contactors. Well - regulated operation is of utmost importance for maximizing the performance and service of plant equipment, as well as ensuring a safe working environment for plant personnel.This a
04/09/2025
Consult
Tip
Consult
Tip
Differential Protection of a Transformer
Differential Protection of a TransformerTransformers are among the key components in power systems. As static, fully - enclosed, and typically oil - immersed devices, faults on them are relatively infrequent. However, even a rare fault can have severe consequences for a power transformer. Thus, safeguarding power transformers against potential faults is of utmost importance.Faults on transformers are mainly categorized into two types: external faults and internal faults. External faults are swif
04/09/2025
Consult
Tip
Consult
Tip
HV vacuum circuit breaker in GIS
Requirements for Larger Tank Enclosure in VCB Vacuum breakers permit the use of insulation media other than SF6. When insulating gases such as dry air, nitrogen, or CO2 are chosen, their insulation performance will be inferior compared to that of SF6 at the same pressure. Stray capacitances to the tank negatively impact voltage division within the vacuum interrupter (VI). This may necessitate a larger, higher - rated - voltage VI.Considerations When Applying VCB in GIS Stray capacitances from th
04/09/2025
Consult
Tip
Consult
Tip
Key Considerations in Transformer Specification
As a professional involved in formulating technical specifications for power transformers, I recognize that defining these specifications is a critical step to ensure equipment reliability, efficiency, and compliance with international standards like IEC 60076. A comprehensive specification must clearly outline all parameters to avoid operational inefficiencies, technical discrepancies, and potential failures. Below, from my professional perspective, are the core considerations in formulating sp
04/08/2025
Consult
Tip
Consult
Tip
How can I determine the number of turns per coil and wire size for a transformer?
How can I determine the number of turns per coil and wire size for a transformer?Determining the number of turns and wire size for transformer coils requires considering voltage, current, frequency, core characteristics, and load requirements. Below are the detailed steps and formulas:I. Define Basic Transformer Parameters Input/Output Voltage (V1,V2): Primary and secondary voltages (in volts). Rated Power (P): Transformer capacity (in VA or watts). Operating Frequency (f): Typically 50 Hz or 60
04/08/2025
Consult
Tip
Consult
Tip
According to the IEEE C37.122 standard, what are the routine tests for high-voltage gas-insulated substations (GIS)?
As required for routine tests of gas-insulated metal-enclosed switchgear, it is necessary to ensure that each equipment unit undergoes systematic routine tests before leaving the factory. These tests (also known as production tests) core on confirming the consistency between the equipment's operating status and design requirements as well as type-test parameters, serving as an indispensable quality control link after assembly. Test parameters are directly derived from type-test data, so routine
04/08/2025
Consult
Tip
Consult
Tip
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122The final assembly of the gas - insulated substation (GIS) takes place in the field. This is where all the diverse components that make up the GIS are brought together for the first time. Even if it were possible to fully assemble the GIS in a factory, it would still have to be disassembled for transportation, shipped, and then reassembled at the installation site.The objective of the field tests is to confirm that
04/07/2025
Consult
Tip
Consult
Tip
Important points in engineering studies in high voltage gas insulated switchgear (GIS)
Important points in engineering studies in high voltage gas insulated switchgear (GIS)Engineering Studies in Gas - insulated Switchgear (GIS)Once the electrical engineer has defined the preliminary configuration of the GIS and determined and specified the primary equipment data, additional studies related to the engineering aspects, as well as the logistics of delivery and installation, must be carried out.The most crucial engineering studies are summarized as follows:1. Transient Recovery Volta
04/06/2025
Consult
Tip